Difference between revisions of "February 8, 2013 - February 14, 2013"
Jump to navigation
Jump to search
(Created page with ''''February 12, 2013''' To-Do List for the near future: * Figure out student schedules * Have a training checklist (on drive) * Think of alternate fiber polishing methods (curr…') |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
'''February 12, 2013''' | '''February 12, 2013''' | ||
− | + | ||
+ | ''To-Do List for the near future'' | ||
* Figure out student schedules | * Figure out student schedules | ||
* Have a training checklist (on drive) | * Have a training checklist (on drive) | ||
* Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper? We want a nice flat, square polished fiber in the end. | * Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper? We want a nice flat, square polished fiber in the end. | ||
+ | * Attach thermistor to tank, and figure a way to attach the other one to the pipe or close to it. | ||
+ | * Test the LabView program with the thermistor and heater/pump automation. If there are any bugs, fix them... | ||
+ | * Build ventilation system once all the parts come in | ||
+ | * Cover the UV lights once they come in |
Latest revision as of 17:54, 12 February 2013
February 12, 2013
To-Do List for the near future
- Figure out student schedules
- Have a training checklist (on drive)
- Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper? We want a nice flat, square polished fiber in the end.
- Attach thermistor to tank, and figure a way to attach the other one to the pipe or close to it.
- Test the LabView program with the thermistor and heater/pump automation. If there are any bugs, fix them...
- Build ventilation system once all the parts come in
- Cover the UV lights once they come in