Difference between revisions of "JB Undergraduate Research Progress, Fall 2013"
Jump to navigation
Jump to search
Bartolotta (talk | contribs) |
Bartolotta (talk | contribs) |
||
Line 5: | Line 5: | ||
When I first gained access to the active collimator, I took it apart in order to understand its structure. Below are pictures that I took upon its disassembly. | When I first gained access to the active collimator, I took it apart in order to understand its structure. Below are pictures that I took upon its disassembly. | ||
− | |||
<gallery> | <gallery> | ||
file:Painted_Scintillating_Fiber.jpeg|The average paint thickness on this scintillating fiber is between 10 and 13 microns. | file:Painted_Scintillating_Fiber.jpeg|The average paint thickness on this scintillating fiber is between 10 and 13 microns. |
Revision as of 19:19, 20 December 2013
This page gives an overview of the work I have done under the supervision of Dr. Richard Jones during the Fall 2013 semester.
I worked in the lab as a student worker during the summer of 2013. I spent my time working on a proposal for a chilled water line for the servers in P403. I finalized this document in the beginning of the Fall 2013 semester. It can be found here.
When I first gained access to the active collimator, I took it apart in order to understand its structure. Below are pictures that I took upon its disassembly.
I also read [