Difference between revisions of "Previous Construction Goals"

From UConn PAN
Jump to navigation Jump to search
(Created page with "* Determine an ideal process to assemble components of the fiber splicing unit. * Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fib...")
 
(No difference)

Latest revision as of 17:32, 23 July 2013

  • Determine an ideal process to assemble components of the fiber splicing unit.
  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
  • Develop/refine a LabView program that controls a water heater and water pump based on water temperature.