Difference between revisions of "January 25, 2013 - January 31, 2013"
m |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 23: | Line 23: | ||
* Switch with someone for next Thursday if at all possible | * Switch with someone for next Thursday if at all possible | ||
* Hyperlink to work progress | * Hyperlink to work progress | ||
+ | <br> | ||
+ | '''Personnel Training''' | ||
+ | *responsible conduct | ||
+ | *chemical health and safety | ||
+ | *msds sheets | ||
+ | *Standard operating procedure | ||
+ | *supervision of at least one shift | ||
+ | *Jim doing spot checks | ||
+ | *students never unsupervised | ||
+ | *I report to Jim | ||
+ | <br> | ||
+ | *Have a training checklist so that we can look and see, at a glance, who has taken what training courses and who has been trained on what equipment in the lab. |
Latest revision as of 20:31, 7 February 2013
January 30, 2013
After a few frustrating weeks trying to figure out how to make the thermocouple, op amp, DAQ, and LabView program to work together I have admitted defeat (at least temporarily). I have made two thermitsors and have housed them in professional looking metal shells (with the help of Brendan). They have been tested, and work relatively well. I may need to calibrate them once the epoxy on them has dried. I still plan to work on getting the thermocouples up and running but for the time being at least we have a reliable way to read temperature and report that temperature to the program in LabView. I think that is the most important thing right now, especially since we have a readiness review from J-Lab on the 7th of February.
For the rest of the day today I plan to go over the LabView program again and make it as efficient as possible.
I would also like to remind Jim that we need to have a schedule for both Jon and Leanna.
Also, I should remind Dr. Jones and Jim that items need to be ordered (ventilation items, light covers, and 22 awg solid red and black wire).
To-Do List for the Next Week
- Clean and keep clean room 405
- Test the thermistors; Make a spreadsheet with recorded values and known temperature to compare. Maybe use the tank in real time to test everything...
- Work on fusing fibers as soon as Jim has put the splicing unit together.
- Iron out the LabView program
- Work on the thermocouple and op-amp when I have time (Unless Dr. Jones would like me to finish it ASAP).
- Come up with a plan for student workers as soon as the opportunity presents itself.
- clean
- Take pictures for presentation on Monday
- Switch with someone for next Thursday if at all possible
- Hyperlink to work progress
Personnel Training
- responsible conduct
- chemical health and safety
- msds sheets
- Standard operating procedure
- supervision of at least one shift
- Jim doing spot checks
- students never unsupervised
- I report to Jim
- Have a training checklist so that we can look and see, at a glance, who has taken what training courses and who has been trained on what equipment in the lab.