Difference between revisions of "Construction of the Full-Scale Tagger Microscope"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers. | * Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers. | ||
− | |||
− | |||
− | |||
Revision as of 19:17, 19 October 2012
Preparations for Construction of the Full-Scale Tagger Microscope
Current Work
- Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
- Determine an ideal process to assemble components of the fiber splicing unit.
- Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
Completed Work
- Clean and organize room P405.
- Help assemble equipment to be used in the manufacture of optical bundles for the tagger microscope.
Pictures