Changes

Jump to navigation Jump to search
no edit summary
Line 32: Line 32:     
[[Image:Tagger Skeleton.jpg]]
 
[[Image:Tagger Skeleton.jpg]]
 +
 +
==Spring 2009 Updates==
 +
I am very excited that as of 27 January we have finally ordered the aluminum metal for the tagger box! Working with the lab group and the UConn Physics machine shop, I hope to have the prototype box assembled by early February. I will hopefully post pictures as soon as construction begins.
58

edits

Navigation menu