Changes

Jump to navigation Jump to search
1,041 bytes added ,  20:52, 28 November 2018
no edit summary
Line 1: Line 1:  
11/1: After dark box run 1837, I opened the dark box but noticed that the curtain was not closed all the way. There was an opening at the bottom. I closed the dark box and did some more normalization tests for step 21.
 
11/1: After dark box run 1837, I opened the dark box but noticed that the curtain was not closed all the way. There was an opening at the bottom. I closed the dark box and did some more normalization tests for step 21.
 +
 +
11/6: I put the CAMMA User Agreement page in the top right desk drawer in 403.
 +
 +
11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack.
 +
 +
We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. The batteries need to be replaced.
 +
 +
Five of the UPS units have bad batteries. They look like two different kinds, but they all say Smart-UPS 3000. I need to find more information to determine which products they are.
 +
 +
Tomorrow I need to ask about the bucket of sand that says KEMICIDE-L and find out whether Andrew can go to JLab.
 +
 +
11/20: I need to arrange the walkthrough at JLab so I can do it on Tuesday and be done with training that day. But I should not call the people listed on the website. I need to ask Richard about it.
 +
 +
11/21: We have 36 Kapton strips that might be all right to use.
 +
 +
11/28: There are numerous coffee stirrers in the box crate labeled Box 9 in the conference room.
1,037

edits

Navigation menu