Difference between revisions of "BW November 2018"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack. | 11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack. | ||
− | We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. | + | We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. The batteries need to be replaced. |
Revision as of 19:52, 19 November 2018
11/1: After dark box run 1837, I opened the dark box but noticed that the curtain was not closed all the way. There was an opening at the bottom. I closed the dark box and did some more normalization tests for step 21.
11/6: I put the CAMMA User Agreement page in the top right desk drawer in 403.
11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack.
We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. The batteries need to be replaced.