Line 152: Line 152:  
===Running the LabView Program===
 
===Running the LabView Program===
 
*Plug in both netbooters. They are located on either side of the tank.
 
*Plug in both netbooters. They are located on either side of the tank.
*Open the "2 Heaters 1.2" Labview program.
+
*Open the "startBetter" Labview program using the desktop shortcut "LabVIEW with Timing." There are two options for controlling the heaters and pumps with this program.
 +
====Let the Program Do It====
 +
*Using the hand tool from the tools menu, set a target time for when the water should reach an adequate temperature.
 
*Click on the dials for "Heater and Pump 1" and "Heater and Pump 2" to turn on all water heaters and pump.
 
*Click on the dials for "Heater and Pump 1" and "Heater and Pump 2" to turn on all water heaters and pump.
 
**There are three temperatures listed on the interface. There is the water temperature, and the two surface temperatures of each heater. Watch for about ten (10) minutes to make sure neither heater gets more than 3-5 degrees Fahrenheit hotter than the water temperature.
 
**There are three temperatures listed on the interface. There is the water temperature, and the two surface temperatures of each heater. Watch for about ten (10) minutes to make sure neither heater gets more than 3-5 degrees Fahrenheit hotter than the water temperature.