Line 20: Line 20:  
8.  Build intermediate storage box<br>
 
8.  Build intermediate storage box<br>
 
9.  Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
 
9.  Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
10. Provide mechanical drawings for parts on the equipment list<br>
+
10. Provide mechanical drawings for parts on the equipment list & get on machining list<br>
    - get onto machining list
   
11. Generate data sheets needed based on construction plan<br>
 
11. Generate data sheets needed based on construction plan<br>
 
12. Generate Excel sheets for construction timelines<br>
 
12. Generate Excel sheets for construction timelines<br>