Line 1: |
Line 1: |
| <big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> | | <big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> |
| | | |
− | <big>[[**UNDER CONSTRUCTION**]]</big>
| |
| | | |
− | 1. Place-Holder<br> | + | 1. Revise the QA Plan<br> |
− | 2. Place-Holder<br>
| + | 2. TDR<br> |
| + | 3. Beamline paper<br> |
| + | 4. Offset plate design<br> |
| + | 5. Generate an equipment list & AutoCAD drawings based on construction plan<br> |
| + | - Dark-box plate (backplane mount) |
| + | - straightening collars (6x6 design?; must stay with plate except during end-milling) |
| + | - bundle collars |
| + | - offset plates |
| + | - chimneys |
| + | - chimney-guides |
| + | - hole locations for base & chimney plates |
| + | - bundle shipping boxes & interior foam |
| + | - gluing block |
| + | 6. Design testing equipment (bundles & single fibers)<br> |
| + | 7. Design dark-cloth<br> |
| + | 7. Build intermediate storage box<br> |
| + | 5. Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br> |
| + | 6. Provide mechanical drawings for parts on the equipment list<br> |
| + | - get onto machining list |
| + | 7. Generate data sheets needed based on construction plan<br> |
| + | 8. Generate Excel sheets for construction timelines<br> |
| + | 9. Generate design for gpu cooling system<br> |
| + | 10. Order: <br> |
| + | - piping components for heat treating fibers |
| + | - components for gpu cooling |
| + | - materials for dark-box |
| + | - stock for: collars, offset plates, chimneys |
| + | - spring-plates |
| + | - springs |
| + | - foam (shipping boxes) |
| + | - cardboard boxes (bundles & spools) |
| + | - hinges (dark-box, storage box) |
| + | - handles (dark-box, storage box) |
| + | - clamps (dark-box, storage box) |
| + | - Velcro, snaps, cloth material |
| + | - mylar for optical box & bundle ends |
| + | 11. Place-Holder<br> |
| + | 12. Place-Holder<br> |
| | | |
| <big>'''Parallel to these tasks''':</big><br> | | <big>'''Parallel to these tasks''':</big><br> |
Line 10: |
Line 46: |
| *Study for QM Prelim<br> | | *Study for QM Prelim<br> |
| *Prepare for the oral exam<br> | | *Prepare for the oral exam<br> |
− | *Place-Holder<br> | + | *Workout more<br> |
− | *Place-Holder<br>
| |