| Line 1: | Line 1: | 
|  | <big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> |  | <big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> | 
|  |  |  |  | 
| − | <big>[[**UNDER CONSTRUCTION**]]</big>
 |  | 
|  |  |  |  | 
| − | 1. Place-Holder<br> | + | 1. Revise the QA Plan<br> | 
| − | 2. Place-Holder<br>
 | + | 2. TDR<br> | 
|  | + | 3. Beamline paper<br> | 
|  | + | 4. Offset plate design<br> | 
|  | + | 5. Generate an equipment list & AutoCAD drawings based on construction plan<br> | 
|  | + |     - Dark-box plate (backplane mount) | 
|  | + |     - straightening collars (6x6 design?; must stay with plate except during end-milling) | 
|  | + |     - bundle collars | 
|  | + |     - offset plates | 
|  | + |     - chimneys | 
|  | + |     - chimney-guides | 
|  | + |     - hole locations for base & chimney plates | 
|  | + |     - bundle shipping boxes & interior foam | 
|  | + |     - gluing block | 
|  | + | 6. Design testing equipment (bundles & single fibers)<br> | 
|  | + | 7. Design dark-cloth<br> | 
|  | + | 7. Build intermediate storage box<br> | 
|  | + | 5. Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br> | 
|  | + | 6. Provide mechanical drawings for parts on the equipment list<br> | 
|  | + |     - get onto machining list | 
|  | + | 7. Generate data sheets needed based on construction plan<br> | 
|  | + | 8. Generate Excel sheets for construction timelines<br> | 
|  | + | 9. Generate design for gpu cooling system<br> | 
|  | + | 10. Order: <br> | 
|  | + |     - piping components for heat treating fibers | 
|  | + |     - components for gpu cooling | 
|  | + |     - materials for dark-box | 
|  | + |     - stock for: collars, offset plates, chimneys | 
|  | + |     - spring-plates | 
|  | + |     - springs | 
|  | + |     - foam (shipping boxes) | 
|  | + |     - cardboard boxes (bundles & spools) | 
|  | + |     - hinges (dark-box, storage box)  | 
|  | + |     - handles (dark-box, storage box) | 
|  | + |     - clamps (dark-box, storage box) | 
|  | + |     - Velcro, snaps, cloth material | 
|  | + |     - mylar for optical box & bundle ends  | 
|  | + | 11. Place-Holder<br> | 
|  | + | 12. Place-Holder<br> | 
|  |  |  |  | 
|  | <big>'''Parallel to these tasks''':</big><br> |  | <big>'''Parallel to these tasks''':</big><br> | 
| Line 10: | Line 46: | 
|  | *Study for QM Prelim<br> |  | *Study for QM Prelim<br> | 
|  | *Prepare for the oral exam<br> |  | *Prepare for the oral exam<br> | 
| − | *Place-Holder<br> | + | *Workout more<br> | 
| − | *Place-Holder<br>
 |  |