Next: Method
Technical Note
radphi-1999-901
Comparison of Expected and Measured Trigger Rates
during 1999 Radphi Commissioning
Richard Jones
University of Connecticut, Storrs, CT
Sept 17, 1999
Abstract:
In a previous report a set of predicted rates for the Radphi trigger
following the barrel upgrade were put forward, based upon a Monte
Carlo simulation. Since that time the experiment has undergone a
commissioning run in which the new detector and trigger electronics
were used for the first time under conditions like those under
which we expect to run. This report compares the predicted to the
measured rates, and demonstrates that the experiment is capable of
taking data with reasonable efficiency at a tagger rate of 50MHz.
Richard T. Jones
1999-10-29