Radphi Conference Call 2/22/02
February 22, 2002
University of Connecticut
Storrs, CT
Present: Craig, Richard, Dan, Phil, Mihajlo, Elton.
Dan:
IU (Dan Krop):
- is working on BGV reconstruction, he is putting constants into database
- ask him for a short note on this BGV work. Hopes to show things at the next
conference call. Will use BGV as veto, to look at 4-cluster events in the
forward. The BGV clustering was always giving 0 clusters, will work on
getting that working after basic calibration is complete.
Mihajlo:
Elton:
- met with Dan and John Carstens in Hall B. Will try to save labeling on
cables during this procedure - wrap labels with clear tape. Spoke with
D. Tiles about removing BGV frame, and they agreed that removal on the
existing cat-walk should work OK -only ! ton of lead + some iron.
- Schedule - G0 test now occupies 17-18 of March, probably extending
into 19 th. Will need to remove beam pipe (1/2 day) and BSD extraction
will come next. Doug has ideas about getting BGV + frame out. We need
the lead wall out and probably the I-beam needs to be removed.